Scheduling the money: job shops, Hungarian matching and AI agents in paymentsBy Pavel Nikolov, November 8, 2026

Part 2: Money movement as a job shop

Part 2 of 5 in a deep dive on money movement as an optimization problem, and how AI agents can use scheduling and matching algorithms. Start with Part 1 if you are new to the series.

The job shop problem

The job shop problem has jobs and machines. Each job is a fixed sequence of operations, each operation needs one specific machine for a known time, and each machine handles one operation at a time. The goal is to finish everything as early as possible, or to keep jobs from running late against their due dates.

It is NP-hard once there are three or more machines, a result from Garey, Johnson and Sethi in 1976 (cited in Abgaryan et al.). One small instance shows what that means in practice.

1963

Muth and Thompson publish a 10 by 10 instance

Ten jobs, ten machines. It becomes the field's standard test, known as ft10, and nobody can prove an optimal schedule for it.

1989

Carlier and Pinson close it

Their branch-and-bound method solves ft10 for the first time, 26 years after it was published.

1991

Applegate and Cook solve it in minutes

Their method solves the same instance in under 7 minutes on a Sun Sparcstation 1, and the edge-finding technique behind it ends up in commercial scheduling software.

Most payment scheduling sits in the same place, hard in theory and solvable at the sizes a treasury actually faces.

From factory floor to treasury

The translation to money movement is close to one-to-one.

Job shop termIn money movement
JobOne obligation: a supplier run, a payroll, a marketplace payout, a treasury sweep
OperationOne step of that obligation: sanctions screening, FX trade, funding transfer, rail submission, stablecoin on- or off-ramp, confirmation
MachineAnything with finite capacity: a rail window, a compliance review queue, an FX desk, a PSP, a wallet signer
Processing timeSeconds on SEPA Instant, minutes for chain finality, hours for a manual review
Machine calendarOperating hours and cut-offs
Due dateWhen the money must arrive, and what lateness costs
Shared resourceThe balance in each account, spent by outgoing payments and refilled by incoming ones
13:0014:0015:0016:0017:0018:0019:00Compliance reviewFX deskT2 (EUR)Fedwire (USD)Stablecoin off-rampT2 customer cut-off, 17:00 CETSuppliersUS payoutMexicoPayrollIllustrative schedule. One compliance analyst is the bottleneck: every job queues there first.
Supplier run (EUR)US payout (USD)Mexico partner (USDC to MXN)Payroll (EUR)
Figure 3. A Friday afternoon as a job shop. The schedule fills in operation by operation. The payroll reaches T2 at 16:45, fifteen minutes before the cut-off.

Four things make the payments version harder than the textbook one. Machines switch off: an operation that misses T2's 17:00 CET customer cut-off waits until the next business day. Liquidity is a shared resource that every payment draws down, which turns the problem into a resource-constrained schedule, the same family CHIPS works in when it decides which queued payments to release.

Lateness also comes in steps. A payment one minute past the cut-off loses a full business day, and a Friday payroll that misses Fedwire lands on Monday. And some processing times are uncertain: a sanctions hit, a congested chain, an off-ramp partner that pauses withdrawals.

Writing the day down

Written down, a treasury objective for one day looks like this:

min ∑j wj · [Cj > dj] + ∑j fj + ∑a ra · B̄a

In words: pay a penalty w for every obligation j that completes after its due date d, add the fees and FX costs f of the routes chosen, and charge the cost of capital r on the average balance B parked in each account a. Every operation must follow its job's order, fit inside its rail's open hours, and leave each account above its minimum balance.

Open-source constraint solvers model this directly: each operation becomes a time interval, each machine a no-overlap rule, each cut-off a window. The schedule answers when. Before that, someone has to decide which account pays for which obligation, and that is an assignment problem.

Continue to Part 3: Who pays what